IWS Develops Lemay Water Disposal Facilities

IWS Energy’s state-of-the-art Lemay Oilfield Water Disposal Facility is scheduled to open and be operational in December 2018 and be in use as a Class One Water Disposal Well. Located approximately four miles south of Bill on Highway 59, the facility is designed to handle a minimum of 7500 barrels per day in addition to five trucks simultaneously at a time. Furthermore, the facility will be operating 24/7 upon it’s opening.

The Lemay facility initially started off as a greenfields property. Prior to drilling, roads and a drillpad were constructed so as to allow a drill rig to be moved into the facility. IWS Energy began drilling of their Lemay Water Disposal Facility in June 2018, reaching a depth of just under 7000 feet. It drilled well into the Tekla and tested positively. It is now set to open in December 2018 as IWS’ first saltwater disposal facility.

With operations expanding rapidly in Wyoming and Converse County, IWS Energy is perfectly placed to fulfil any commercial oilfield water disposal needs in the region. If you have any questions or enquiries, do not hesitate to contact us at info@iwsenergy.com or complete the contact us page.

Share the Post:

Related Posts